Interactive Map of the company

An interactive map of all the company’s various parts, workshops, repair and construction area. This map illustrates and gives a brief description of the nature of the work being done by each sector and each provided with photos.

Metal proc.& Unit assembly (WS1 & WS2)

Metal proc.& Unit assembly (WS1 & WS2)

Shown area consists of the following:At the east entrance located Metal processing W/S, forward to which the unit assembly W/S
  1. Metal processing W/S is equipped with:
    • 2 NC Plasma cutting machine. Rail length:28m, rail width:8.2m
    • 1 Planer-Type Multi-Head Cutting Machine. Rail length:20m, rail width: 7.5m
    • 6 Electromagnetic Lifting appliance
    • 1 Hot work platform
    • 16 overhead cranes
  2. unit assembly & welding W/S Sheets, plating &various profiles (bulb flats, T sections, angles) previously cut to size and shaped in the metal processing WS are to assemble& welded making medium size units before it is sent to next block WS
Machining & Electric W/S (WS7 & WS4)

Machining & Electric W/S (WS7 & WS4)

Two workshops are located in this area:
  1. The machining shop equipped with various turning, milling, skimming & boring machines of various sizes stationed and/or portable to suit all the ship construction& ship repairs various needs
  2. Electrical installation W. shop main activity is :- cable laying, electrical circuits installation, checking testing&put into operation of all the power source equipment, vessel's lighting, controls&all navigation crew living facilities
Machinery & Outfitting W/S (WS5 & WS12)

Machinery & Outfitting W/S (WS5 & WS12)

Two workshops are located in this area:
  1. Mechanical installation w. shop, main activity is the main & auxiliary engines installation together with shaft alignment& propeller fitting
  2. Outfitting W/s :ship's outfittings either fabricated & installed onboard the ship and/or just installed together with the deck & mooring equipment
Block assembly & Welding W/S (2A)

Block assembly & Welding W/S (2A) )

The workshop consists of 3 bays, with span 33.0m and 189m length, the shop is equipped with:
  • (6) Overhead cranes 50T with 18m height.
  • (8) Overhead cranes 16T with 14m height.
  • (180) sets of various electric welding machines.
& main activity is producing mega blocks from the units& subsections supplied from hull shop.
Pipe W/s (WS6)

Pipe W/s (WS6)

The shop consists of one three-bay plant buildings,
  • The W/S consists mainly from 3 bays, 2among them are for various processing cutting to size, bending, shaping& welding
  • Leak test & hydro tests are also being done in special area within the 2 bays using the suitable equipment& indicators
  • Bay 3 devoted for chemical cleaning &passivation
Electricity Station
 

Electricity Station

The building area is (1264 m2), supplied by (2) Main Transformers (11KV / 6KV) , electric power 20 M.V.A
Northen berth
 

Northen berth

One of the two inclined building berths is the northern one with the following particulars:
Length
180 M
Breadth
28 M
DWT
20000 (T) Cargo 35000 (T) Tankers
equipped with pair of inclined sliding ways to which launching cradles are normally laid down for further sliding to launch the ship to touch water
Southern berth

Southern berth

One of the two inclined building berths is the northern one with the following particulars:
Length
180 M
Breadth
28 M
DWT
20000 (T) Cargo 35000 (T) Tankers
equipped with pair of inclined sliding ways to which launching cradles are normally laid down for further sliding to launch the ship to touch water
Electricity Station

Electricity Station

The building area is (1264 m2), supplied by (2) Main Transformers (11KV / 6KV) , electric power 20 M.V.A
Natural Gas station
 

Natural Gas station

The Station undertakes the supply of natural gas of shipyard, 12.50m length, 10.50m width The station equipped with:
  • 1 Pressure regulating box 1300m3/h is adopted, for pressure regulation for cutting Machines
  • 1 Pressure regulating box 600m3/h is adopted, for pressure regulation forthe boiler room
  • 1 Additive atomization mixed device
Oxygen and CO2 Station
 

Oxygen and CO2 Station

The Station undertakes the supply of oxygen and carbon dioxide The Oxygen Unit is equipped with 2 liquid oxygen storage tanks 20m³ and 30m³, respectively
  • Filling equipment rated to be a maximum of 480 bottle/day
  • The carbon dioxide Unit is equipped by 2 liquid carbon dioxide storage tanks 20m3 each, with filling equipment rated to be a maximum of 150 bottle/day
Dock No. 2
 

Dock No. 2

The shipyard provided with 2 dry docks suitably equipped for all repair &maintenance works with the following characteristics:
Length
267 M
Breadth
39.6 M
DWT
85000 (T)
Cranes
30 T Portal Carne(1 Off) 16 T Portal Carne(1 Off)
Fiber glass W/S
 

Fiber glass W/S

Yachts, pleasure boats& many other small craft vessels are built from GRP are the normal products of the subject W/S with which the shop specially constructed & equipped
Main store
 

Main Store

Main store area where the material and equipment necessary to build various ships are well stored and preserved . Necessary yard consumables, including welding are also well stored in well ventilated ,clean& tidy store areas
Dock No. 1
 

Dock No. 1

ASY has 2 dry docks suitably equipped for all repair &maintenance works with the following characteristics:
Length
158.5 M
Breadth
18.9 M
DWT
10000 (T)
Cranes
18 T Portal Carne(1 Off) 12 T Portal Carne(1 Off)
Painting W/S (WS10)

Painting W/S (WS10)

The shop consists of one grit& shot blasting comperment and two coating comperments, with dimension 42.0m×21.0m, and 13.0m height each, The workshop is equipped with many systems:
  1. Grit blasting system
  2. Grit recycling system
  3. Vacuum recovery system
  4. Full ventilation and dust removing system
  5. Dehumidification and air supply system
  6. Paint spraying system
Air compression station

Air compression station

The station dimension is 62m length, 28m width. The station is equipped with:
  1. (4) Compressors 190 m3/Min.
  2. (1) Compressor 100 m3/Min
  3. (1) Overhead cranes 5T.
Steel Product Preprocessing Workshop

Steel Product Preprocessing Workshop

The Workshop dedicated toplates processing (blasting – painting) with 30m length, 12m width The workshop is equipped with: - (1) crane 5Ton
Foundery WS (WS9)

Foundery WS (WS9)

The station dimension is 62m length, 28m width. The station is equipped with:
  • There are two new furnace 2 ton and 150 kg capacity.
  • (The 2 ton used to melt cast iron.
  • The 150 kg used to melt nonferrous metal.
  • There are Green Sand Unit (Mixer, Checkout and Belts)And 2 Cleaning Machine.
  • Our foundry products grey cast iron and nonferrous metal (Copper, Aluminum and Zinc)