We are Alexandria Shipyard
Alexandria shipyard was established in 1962 inside the free zone of Alexandria port . ASY is a pioneer company in shipbuilding , ship repair and heavy industries in Egypt and the Middle East. The total yard’s land area is about 400,000 m2 with total quays length of 1200 m. Currently, the company is affiliated to the Marine industries & Services organization owned by the Egyptian Ministry of Defense. The company enjoys a unique position in the Arab region where it has built most commercial ships belonging to the Egyptian fleet. It has achieved success in other areas as well, including the construction of the largest ship ever built in Egypt with a capacity of 38,500 tons, and the completion of the only oil rig built to date in Egypt.
Vision & Mission
Our aim is to become the market leader in shipbuilding, ship repair and related services in the Mediterranean, Africa and the Middle East region, growing and developing unrivalled vessels and services. We want to exceed our clients’ expectations and premium satisfaction in terms of quality, innovation and reliability. We aspire to consistently build successful relationships with our customers, partners and employees in a safe and healthy environment.
Alexandria Shipyard is a client-focused, international shipbuilder with long history. We build innovative ships of excellent quality, supported by a worldwide supply chain of sales and services including building, maintenance and repair facilities.
Historical Timeline of ASY CEO
Welcome to ASY’s CEO history timeline section. Here, you will discover the history of our CEOs, from their origins to their current leadership position. We are sure you will enjoy this journey through the history of our company and learn something new about our extraordinary history.
From 23/7/1961 To 2/1/1972
Eng / Ahmed Mohamed Efat
From 21/1/1972 To 2/6/1973
Rear Admiral / Ahmed Ihsan Madkour
Mr./Madkour was reassigned as chairman for ASY during which time many general cargo ships were built & contributed in the development of the Egyptian commercial fleet
From 20/6/1974 To 13/3/1977
Eng /Mohamed Abdelhamid hussien
He continued the production with the series of general cargo ships of 6000 TDW
From 31/3/1977 To 26/9/1981
Eng / Hassan Elsayed Ahmed
He continued the work of cargo ships under construction during his period
From 28/9/1981 To 1/4/1986
Eng /Ahmed Farouk Abdelmonem
During which time jack up drilling rig Helen Cecil was built for the first time in Egypt together with series of multi-purpose cargo ship with RoRo access to the tween deck named Hamlet type and started the negotiation of the 2 biggest bulk carries ever built in Egypt. He also sign the contract and delivered both carries to the Egyptian navigation Co.
From 31/3/1986 To 30/6/1988
Eng /Mahmoud Salah El-Din Ahmed Omar
Back once more to the very successful multi-purpose cargo ship with the RoRo access to the twin deck
And again Mr. Omar was promoted from the general manger of production to the chairman of the yard to continue in fact his effort in all activities with particular focus on the ship repair side hoping to wide spread the repair services all over the Mediterranean
From 1/7/1988 To 23/12/1993
Eng/ Tawakal Ahmed Elmagrabi
In the core of his achievement of the construction of many RoRo cargo ships &for the first time built under the supervision of German Co. & owned by German owners. Due to the excellent particulars of the subject ships Egyptian navigation Co. ordered some sister of those ships (Quseir / Nuweiba)
From 25/12/1993 To 28/11/1996
Eng / Adel Abdelgawad
He went the same way during his time ,the orders of the RoRo cargo ships for the foreign owners had been continued (sawidi Ship)
From 29/11/1996 To 24/10/2000
Eng / Ahmed Mohamed Elarag
Technical resume
- BSc in mechanical engineering year 1964
- Joined the ASY as basic engineer 1964
- He was promoted to production manger 1980
- In 1996 he was promoted to chairman of the board of the shipyard until year 2000
Achievements during his period
- Many various types of ships :general cargo, RoRo ships, multi-purpose ships were built during his time
- Manufacturing all Alexandria pedestrian bridges
- Manufacturing all Sewage requirements of Alexandria Governorate in the field of plumbing
- Manufacturing Components of sugar factories
- Manufacturing Distillery Tower of Nasr Petroleum Company
- Manufacturing gantry crane of 365 tons for the electrical power station west of west Cairo
From 25/10/2000 To 31/7/2007
Rear Admiral/Hussin Mohamed Sennara
Technical resume
- Chief engineer in Egypt navy
- Commander of the navy main workshop
- Chief engineer of the Egyptian navy
- Commander in chief technical assistant
Achievements
- 2 RoRo cargo ships of 6000 TDW Al-Hurreya 1&2 were built & delivered during his time to MIASO shipping Co.
- He contributed in the transfer of ownership of the shipyard to the military forces
- Many other engineering activities were undertaken , fabrication of spare parts for cement Co., Oil Co., tobacco eastern Co. & sugar producer Co.
- Ship repair activity had been supported, developed& upgraded so that majority of local commercial fleet ships & various navy vessels were carried out their routine maintenance work together with all machinery& hull different repairs due to the vertue of his good management
From 1/8/2007 To 31/8/2012
Rear Admiral/ Ibrahim Gaber Eldosoky
- During his time full transfer of the ownership of shipyard to the military forces was completed
- He made great effort to realize the upgrade of the shipyard which could be considered the resurrection of the shipyard which could be summerized as follows :
- Establishing a new huge workshop of the block assembly &welding
- Establishing a new huge piping shop fully newly equipped accompanying great area supplement by chemical cleaning & passivation workshops
- Also a new blasting &painting modern environment friendly workshop was established
- Flat area next to southern berth had been prepared supported by huge lifting capacity overhead rail mounted crane of 300 ton carrying capacity
From 1/9/2012 To 30/6/2014
Rear Admiral/Soliman Ibrahim Elshahat
Technical resume
- BSc in power mechanics & master degree in shipping & logistics
- Head of Maintenance and Ship Repair Division in Naval Forces
- Occupied technical leading posts in ASY and promoted to chairman of the shipyard
Achievements
- During his time numerous achievement were taken place such as:
- Reactivation of glad fiber workshop
- Repair of the Iraqi floating dock name sea of Arabia
- Shared the supervision during the development of ASY utilized by Chinese contractor
- Many other ship types & projects were being carried out during his time
From 1/7/2014 To 10/8/2015
Rear Admiral/ Magdy Amin Abuklila
His main achievement in fact is the completion, finishing & celebrating the major development project of the shipyard in order for the output of the steel production to be escalated from 4000 tons to 40000 tons
He also contributed in the construction of various tug boats and during his time the ship construction activity resumed after the completion of the development project
From 11/8/2015 To 23/12/2016
Rear Admiral/AbdElhamid Hussien Esmat
- His main achievement was the preparation & taking the major role in having the engineer & technicians acquainted of the new & up-to-date technology in connection with the construction of the corvette type Gowind by the appropriate training courses locally & abroad
- Kickoff event of the new corvette had been performed by steel cutting of the 1st bottom sections of the corvette
- Berth trials & short experimental sea trial of AL Hurreya-3 has been carried out during his time
From 22/12/2016 To 28/1/2020
Rear Admiral/ Osama Fathy Hassan
Dawn of achievements
AS the year 2017 commenced to show up, the 1st two bottom blocks where the machinery space of the 1st corvette to be built in the whole history of the shipbuilding, ever, in Egypt, started to emerge from long hibernation to move forward from the flat area to building berth marking the keel laying event of the corvette named after the heroic city “port said” .Many of the blocks and activity came to light in the various workshops of ASY and by the time the shape of the 1st corvette gradually grown up on the building berth until that date of 6th September 2018 when the vessel nicely &smoothly slid down from the berth to touch the sea water for the 1st time marking the great occasion :launching of the unique navy vessel type, “corvette port said”. On the same date “keel laying” event of sister corvette was celebrated , building of which progressed steadily until that date on May 11, 2019 when the 2nd corvette was successfully launched to touch the water for the 1st time bearing the name “Almoaz” to join the prototype one, berthing alongside undergoing fitting out, machinery installation, quay trails & preparation for sea trial & delivery. Many other activities & important milestones & events have taken place such as:
- Keel laying of 3rd corvette
- Delivery of tug boats for Alexandria port Authority
- Sea trails &delivery of River container, cargo barges
- Construction, commissioning& installation in place of dry docks caissons(gate) for both the east &the west dry docks, replacing the very old gates of the docks
From 28/01/2020 To 25/7/2020
Rear Admiral/ Ahmed Ahmed Morsi
Achievements
Contributed to many company achievements including the training center upgrade albeit he recently took charge of the company CEO.- Launching E.N.S Luxor (986), the 3rd Gowind corvette ship to be launched by A.S.Y facilities.
- Beginning of the Gowind corvette “port said” sea trials.
- Signing a contract with Cooperation Petroleum Company “CPC” for building one oil tanker and deliver one from china.
- Delivery of 2-tug boat for Alexandria Port Authority.
- Finalize the dispute held against the delivery of Ranfic boats and starting the delivery of the first batch of 10 out of 100 boats.
From 25/7/2020 till Now
Rear Admiral / Hossam El Din Ezzat Kotb
Technical resume
- BSc in Power Mechanics & Master Degree in shipping & logistics
- Head of Maintenance and Ship Repair Division in Naval Forces
- Egyptian Navy Shipyard Commanding Officer
- Egyptian Navy Chief in Command Assistant for Technical Affairs
Achievements
The Vision Adapted To Enlarge the ASY Capacity and Outcome Concentrated at :- Using the proper ERP tools to increase the usage of Human resource available
- Reduce the time consumed to outsource needed trades and concentrate on training the trainers to the best that training center could achieve
- Early Delivery of the first Mini Tug Boats batches and the second to follow
- Planning for Early delivery of the GOWIND three Corvette Class built by ASY in Early Dates Fits for the Egyptian Navy Operational Demand
- Prepare ASY Facilities To Start The Training and Adaptation Needed for the Manufacturing Facility and Workshops To Be Ready for The German Frigate Shipbuilding Activity
- Facilitate the New and Remaining requirement added to Accomplish and be able to deliver the built tug boats for Alex. Port Authority On Time..