Industrial project
As part of its growth strategy ASY decided to diversify its activity and utilize its vast capabilities to cooperate with the Egyptian Industrial sector and fabricate its needs in field of heavy plants engineering and support them in the realization of their projects. The company is now at the forefront of fabricating heavy plant solutions and providing support to various projects. With a strong focus on steel mills, cement factories and sugar factories for the fabrication of production line components and heavy equipment, the company has positioned itself as a pioneer in this field.
Cooperation with Sugar Companies
Dakahlia Sugar Company 2nd Production Line Project (2007)
Alexandria shipyard scope of work :
The fabrication and delivery of the pulp dryer station equipment's with total steel weight of 450 tons
Alexandria Sugar Company Project (2011)
Alexandria shipyard scope of work :
The fabrication and delivery of Side tipping unit and pallet conveyor with total weight of 200 tons
The rehabilitation of the Diffuser carrying rollers
Delta Sugar Company Project (2012)
Alexandria shipyard scope of work :
The fabrication and delivery and erection of Vertical continuous crystallizer unit and pallet conveyor with total weight of 260 tons
Alnouran Sugar Company Project (2015)
Alexandria shipyard scope of work :
The fabrication and delivery of the pulp dryer station equipment's , pelletizing station Masecuite tanks and Molasses tank with total steel weight of 2300 tons
Alexandria Portland Cement Company (2000)
Alexandria shipyard scope of work :
The fabrication and delivery of the Coolers filters , Cement mills Main filters and Dust collector
Alexandria National Iron & Steel Company “ANSDK“ (ezz steel) (1996)
Alexandria shipyard scope of work :
The fabrication and delivery of the Dedusting system , Billet Distributor and Tundish
Suez Steel Company (1999)
Alexandria shipyard scope of work :
The fabrication and delivery of the Dedusting system , Water Treatment station and Scrap bucket
Arab Company (ARCOSTEEL)
Alexandria shipyard scope of work :
- The fabrication and delivery of the Laddle Transfer car
Cooperating with water and wastewater companies to develop wastewater treatment plants
ASY work space/Raising the efficiency and absorptive capacity of the station from 70,000 m3/day to 105,000 m3/day.
Replacement, renewal and conversion of MBBR tertiary processing.Implementation of metal factories and bridges for basins.Sludge production plant for recycling.