Overview of all the company Workshop

The Workshop Total Area is About 8880 m2 Serviced by (Qty 8 ) 10 Tons Overhead Cranes
The workshop is equipped with modern and Automated Metal Plate Cutting Machines including CNC Plasma Cutting Machines able to cut upto 40 mm Steel and Aluminum plate thickness ,Automatic Gas Cutting Machine to cut upto 80 mm Steel and Aluminum plate thickness, Mechanical Cutting Machines , Hydraulic Presses upto 800 Ton and Rollers to be able to deal with up to 35 mm thickness of 8 meter plate width capitalizing all the essential process ( Marking – Cutting- Forming ) in all types of shipbuilding metals (Steel – Stainless Steel –Aluminum ) , attached to the workshop a 6000 m2 stockyard for the Plates and Sections,
The Workshop Total Area is About 8880 m2 Serviced by (Qty 8 ) 10 Tons Overhead Cranes READ LESS
In line with the Metal Processing Shop comes immediately the unit assembly and Welding Workshop. Four spacious bays each specialized in certain product type forming the whole area occupied by the subject shop. The first Bay is specialized in the assembly & welding of the flat section (plating together with longitudinal & transverse stiffening mesh and brackets thereto) of total weight not to exceed 16 tons which is the maximum lifting capacity of the overhead cranes available in the workshop. Bay Number 2 comes next where the assembly & Automatic submerged arc welding stand is located at the entrance of the bay for the purpose of providing huge welded flat panels to various bays of the workshop and generally for the shipyard various needs including the bulkheads and the small decks to be Assembled and Welded in the subject bay. Bay number 3 comes next where small Sections /Units of stiffened floors and girders, built up web frames, deck beams are assembled and welded using mainly Semi-Automatic CO2 Flux cored wires. Bay Number 4 comes next where the slightly curved and framed Sections /Units are assembled and welded in the same way as that of bay 3 It is normally that all the units/sections to be inspected by the QC staff attending permanently the workshop and any NDT to be applied to all built sections prior to transported to the block workshop.
The Shop is one of the added value process to the shipyard established during the upgrade process, about 4446 m² area, is essentially provide the shoting and/or grit blasting and coating for various blocks and sections prior to final transfer and mounting on the building berth. The shop consists of three compartments one for the blasting process and two for coating. The coating shop is mainly provided with various systems, Steel Shot and/or Grit Recovery, Vacuum Recovery, Partial Dust Removing, Full Ventilation and Dust Removing, Dehumidification and Air Supply, Paint Spraying, Compressed Air, Environment-Friendly exhaust and environment-friendly air supply. In addition to the foregoing the workshop is also carrying out ship insulation works, thermal, fire and sound insulation onboard various ship Deck covering works of various ships types is also one of the principal activities of the workshop
The vessels are launched using the launching cradles which to be prepared to suit the various hulls of different ship frame and then after to be slid down on the inclined sliding ways.

The various blocks and accumulated huge blocks that accomplished in the block shop and those at the pre-berth area are transported to either the northern or the Southern Berths for further assembly, mounting and erection welding, machinery installation, shaft alignment, controls, mooring equipment are all carried out to the satisfaction of attending surveyors and in accordance with the relevant class requirements, all controlled by the adequately qualified quality control personnel, whom as essential part of their job supervise, assess the various testing requirements NDT, leak tests and dimensional check where necessary.


Mechanical workshop main activity is ship's machinery installation in both during ship repairs and ship building activity , in the ship building activities ,the installation stages progressed along the ship building activity with various ships starting from fabrication & installation of various Machinery Seating, Pumps, Compressors, Auxiliary Engines, Main Engines, Shaft line with various bearing thereto all together with the installation of various hydraulic system including (Steering System ,Lifting Appliances, RoRo equipment (lifts, Ramps, Movable Decks, Watertight Door) different classification society dictate specific requirement for some equipment installation including Shaft alignment, main and auxiliary engine leveling, adjustment are considered principal activities due to which the workshop is equipped with the necessary up-to-date tools to fulfill the stated functions(torques spanner, optical sighting tools-tachymeter, laser tracker&digital caliper gauge)
The workshop is also responsible for the installation of air condition system& refrigeration units and other anti-pollution system.
The workshop major activity in addition to the previous ones is to have the lead & supervision of all commissioning of the various systems whether alongside as quay trails or during sea trails


The Workshop is capable of installing Ship’s various accessories that requires highly skilled workers and special installation equipment , accessories like ladders & Accommodation stair ways, windows, doors, deadlight& Skylight are all either fabricated and/or procured and all to be installed, Welded and tested on board by the virtue of well-equipped outfitting workshop which normally provided with highly skilled labor force.
Various air ducts in the accommodation space, Provision stores , Galley equipment, Deck machinery, Access hatches, Hatch covers, Windlass machinery, Capstan, Mooring Equipment, Bollard Bits, Fairleads, Masts etc. are all being manufactured and/or installed on board the ship by highly skilled labour of outfitting w/s
Electrical installations of new constructed ship is normally taking place parallel to other installation as well but essentially for powering all the equipment. it took place since the date of keel laying till reaching to final activity after ship’s launching and during berthing alongside outfitting quays and extends to cover all the berth trials, commissioning and sea trials various activity of electrical installation workshops can be summarized as follows:-- Cable trays installation
- Electrical equipment, instruments and machine installation
- Cutting, laying & Connecting of all Cables and Connectors
- Installation and Connection of all Various Circuits Onboard the Ship: Lighting System, Navigation System
- Put into Operation of All Electrical Equipment and all Related Instruments